Skip to content

Medical Building – Phase 2 PVC Installation

Before
After

Two years letter, this medical facility had budgeted for additional work! Because of Covid, material availability was a problem, so we made the decision to switch manufacturers for phase 2, while still providing a PVC membrane.

As with phase 1, the base layer of the existing two roofs was left in place and we installed a Dens Deck cover board and a 60mil PVC roof membrane.

To coincide with the project, the facility identified and removed all un-used conduit lines, and a plumbing contractor replaced multiple drains that had been leaking.

This entire facility is now covered by a 20-year NDL warranty, and all leaks have been resolved!

Interested in an estimate?

Contact our team today to get started on an estimate, or to answer any additional questions that you may have.